@inproceedings{e1f117b137c346a294deb02693a72941,
title = "FIAPP trends",
abstract = "The various phases in the life cycle of a capital project are planning, procurement, construction, operation and maintenance. Lack of interoperability between different software tools is a major problem in attaining continuous data flow between phases. Integrating communication among the various actors of different phases give researchers a new dimension to explore in an effort to increase quality, efficiency and productivity. Implementing FIAPP in the construction industry has gained momentum in Europe and just recently but to a lesser degree in the United States. This paper compares the status of FIAPP in construction industry in European countries and compares that with efforts in the United States and proposes a model for rapid deployment. Copyright ASCE 2006.",
keywords = "Communication, FIAPP, ICT, Interoperability, Phase",
author = "Goedert, {James D.} and Pavan Meadati",
year = "2006",
doi = "10.1061/40798(190)57",
language = "English (US)",
isbn = "0784407983",
series = "AEI 2006: Building Integration Solutions - Proceedings of the 2006 Architectural Engineering National Conference",
pages = "57",
booktitle = "AEI 2006",
note = "AEI 2006 ; Conference date: 29-03-2006 Through 01-04-2006",
}