T1 - Integrated evaluation of cost, schedule and emission performance on rock-filled concrete dam construction operation using discrete event simulation
AU - Liu, Chunna
AU - Ahn, Changbum R.
AU - An, Xuehui
AU - Lee, Sanghyun
PY - 2013
Y1 - 2013
N2 - Massive concrete dam projects will be conducted in the next ten years to respond to the increasing demand for clean energy and water resources in developing countries. With more attention paid to environmental issues, there is an increasing need to develop a methodology for reliably predicting the integrated performance of cost, schedule and emission factors in the planning stage. In this paper, we propose a methodology for using discrete event simulation (DES) for dam construction processes to enhance the performance dynamically. A case study is conducted to demonstrate the effectiveness of the DES model, which is validated by the actual cumulative progress on the construction site. The results indicate that the cost, schedule and emission performance are highly interactively correlated when using RFC in dam projects. The promoted methodology could help construction managers compare the integrated performance of different options in RFC dam constructions.
AB - Massive concrete dam projects will be conducted in the next ten years to respond to the increasing demand for clean energy and water resources in developing countries. With more attention paid to environmental issues, there is an increasing need to develop a methodology for reliably predicting the integrated performance of cost, schedule and emission factors in the planning stage. In this paper, we propose a methodology for using discrete event simulation (DES) for dam construction processes to enhance the performance dynamically. A case study is conducted to demonstrate the effectiveness of the DES model, which is validated by the actual cumulative progress on the construction site. The results indicate that the cost, schedule and emission performance are highly interactively correlated when using RFC in dam projects. The promoted methodology could help construction managers compare the integrated performance of different options in RFC dam constructions.
UR - http://www.scopus.com/inward/record.url?scp=84894196981&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=84894196981&partnerID=8YFLogxK
U2 - 10.1109/WSC.2013.6721678
DO - 10.1109/WSC.2013.6721678
M3 - Conference contribution
AN - SCOPUS:84894196981
SN - 9781479939503
T3 - Proceedings of the 2013 Winter Simulation Conference - Simulation: Making Decisions in a Complex World, WSC 2013
SP - 3109
EP - 3120
BT - Proceedings of the 2013 Winter Simulation Conference - Simulation
T2 - 2013 43rd Winter Simulation Conference - Simulation: Making Decisions in a Complex World, WSC 2013