TY - GEN
T1 - Integrated traffic signal control along corridors with multiple intersections near highway-rail grade crossings
AU - Chen, Yifeng
AU - Rilett, Laurence R.
PY - 2013
Y1 - 2013
N2 - Traffic signal optimization for traffic signals located near highway-rail grade crossings (HRGC) can be difficult because of the complex nature of the interactions between the two systems and the necessity of considering multiple objectives, such as safety and operational efficiency. The problems are magnified when considering traffic control for corridors that have multiple intersections located near HRGCs. This paper develops a methodology for optimizing traffic signals along a highway-railway corridor while considering the dual objectives of maximizing safety and efficiency. The Highway 6 (Cornhusker Hwy) corridor in Lincoln, Nebraska was used as a test bed. The corridor was modeled in VISSIM, and was used to emulate the traffic control along Highway 6, including the preemption logic. The traffic control logic was modeled using the Vehicle Actuated Programming (VAP) in the VISSIM simulation model. In addition, the logic allows multiple train events on the railway track that runs parallel to Highway 6 to be modeled. The model was calibrated to local traffic conditions using empirical field data. The impact of train frequency, length, direction, speed, etc., on the performance of the network and pedestrian safety will be evaluated.
AB - Traffic signal optimization for traffic signals located near highway-rail grade crossings (HRGC) can be difficult because of the complex nature of the interactions between the two systems and the necessity of considering multiple objectives, such as safety and operational efficiency. The problems are magnified when considering traffic control for corridors that have multiple intersections located near HRGCs. This paper develops a methodology for optimizing traffic signals along a highway-railway corridor while considering the dual objectives of maximizing safety and efficiency. The Highway 6 (Cornhusker Hwy) corridor in Lincoln, Nebraska was used as a test bed. The corridor was modeled in VISSIM, and was used to emulate the traffic control along Highway 6, including the preemption logic. The traffic control logic was modeled using the Vehicle Actuated Programming (VAP) in the VISSIM simulation model. In addition, the logic allows multiple train events on the railway track that runs parallel to Highway 6 to be modeled. The model was calibrated to local traffic conditions using empirical field data. The impact of train frequency, length, direction, speed, etc., on the performance of the network and pedestrian safety will be evaluated.
UR - http://www.scopus.com/inward/record.url?scp=84890032789&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=84890032789&partnerID=8YFLogxK
U2 - 10.1115/JRC2013-2428
DO - 10.1115/JRC2013-2428
M3 - Conference contribution
AN - SCOPUS:84890032789
SN - 9780791855300
T3 - 2013 Joint Rail Conference, JRC 2013
BT - 2013 Joint Rail Conference, JRC 2013
T2 - 2013 Joint Rail Conference, JRC 2013
Y2 - 15 April 2013 through 18 April 2013
ER -